It paid for itself in 9 days, and held 48 without a water truck
Context
A municipal road carrying 1,200 to 1,500 vehicles a day that required two water trucks and a grader day and night. DMS-90® was chosen because its cost is comparable to that of calcium chloride.
With your permission we use Google Analytics to see which pages are read and to improve the site. Without it, nothing from Google is loaded. You can change your mind at any time from the footer. Privacy policy