Skip to content
ABCDust
Menu
Book a meeting
← All applications

Haul roads and ramps

91–98% suppression of PM10 and PM2.5 with DMS-DS® in the water truck's water

Book a meeting
Aerial view of four haul trucks on a treated ramp in Chile

On haul roads and ramps, the DMS-DS® suppressant is dissolved in the water truck's water. Efficiency is computed against a baseline measured on the same section.

At a glance

On haul roads and ramps
DMS-DS® in the water truck's water
PM10 and PM2.5 suppression (DMS-DS®)
91–98%
Braking distance
35–82% shorter than with watering alone
Water savings
up to 90%
Tested on
ramps of up to 16% with 600 t trucks
Measurement on roads
TSI DustTrak II 8530 · EPA OTM 34
DMS-DS® certification
BNQ 2410-300, certificate no. 4192
Additive packaging
1,000 L drums or IBC totes
Management platform
DMS-ONE®

Source: DMS-DS® technical data sheet.

suppression of PM10 and PM2.5 on roads with DMS-DS®
91–98%
less watering water
up to 90%
shorter braking distance than with watering alone
35–82%

Two emission sources, two ways to treat them

The road emits along kilometers, every time a tire passes. The loading front emits at a single point, every time the shovel moves material.

Haul roads and ramps
Heavy, continuous traffic, 10 to 15% grades, loose soils with a fine fraction. The running surface is treated with additive in the water truck.
Loading fronts
Shovels and loaders working without pause, fine material disturbed on every pass, trucks and personnel next to the source. The air at the loading point is treated with long-range mist.

As an order of magnitude, hauling contributes around 40% of a mine site's dust and loading around 10%. These are indicative values; each site's baseline replaces them with the values measured there.

Loading fronts are treated with long-range fog cannons: see the loading fronts sheet.

Haul roads and ramps: additive in the water truck

On ramps with 10 to 15% grades, dust is not only an environmental issue: it reduces the operator's visibility and lengthens the braking distance of a loaded truck.

Watering with water alone
Watering with a water truck erodes the running surface instead of stabilizing it. The water evaporates and the passes have to be repeated several times a day.
Water with DMS-DS®
The additive binds fine particulate matter and improves the friction of the running surface. Each application adds a microlayer on top of the previous one.
  • Drone view of a water truck watering a ramp in the desert
    Water truck applying on a ramp.
  • Drone view of a water truck watering a haul road junction
    Application at a haul road junction.

How it is applied

DMS-DS® is a proprietary blend of 0.25 µm nanopolymers. It is applied with a water truck.

  1. 01

    It is added to the water truck loaded with water

    The highly concentrated additive goes into the tank and mixes with the watering water.

  2. 02

    The road is watered, topically or mixed in

    DMS-DS® allows both forms of application: on the surface or mixed into the running layer.

  3. 03

    The microlayers build up with each application

    The foam forms microlayers that overlap one another. The product dries clear, without staining, and resists water, UV radiation, and acidic or alkaline water.

ABCDust's technical team defines the dose and the reapplication frequency for each site, according to soil type, traffic and climate.

What changes on the road

91–98%

Less PM10 and PM2.5

Suppression efficiency of DMS-DS® on dust raised by traffic.

35–82%

Shorter braking distance

Compared with the same road wetted with water only. It also reduces the risk of skidding and hydroplaning.

up to 90%

Less watering water

Which also lowers the cost of watering and of maintaining the running surface.

16%

Tested on steep ramps with 600 t trucks

DMS-DS® was tested on ramps with grades of up to 16% with 600-tonne loaded haul trucks. Under those conditions it shortened braking distance by 35–82%.

no. 4192

BNQ 2410-300 certificate

It meets the standard setting ecotoxicological requirements for dust suppressants on unpaved roads; certificate valid from April 11, 2025 to April 30, 2027. The product is non-toxic, non-corrosive and non-ionic.

What is supplied for the road

Three additives according to the type of road, plus the instruments and the platform used to verify the result.

DMS-DS®Suppressant · nanopolymer
For haul roads, ramps, high-altitude sites and high-tonnage hauling. 91–98% of PM10 and PM2.5, braking 35–82% better than with watering alone, and up to 90% less water. Also used on underground mine roads. Shelf life of 12 months.
DMS-80®Low-cost suppressant and stabilizer
For mine, agricultural and industrial roads, with ultra-low chloride levels. PM10 and PM2.5 suppression of 85–90%, water savings of 60–90%, cold resistance down to −30 °C. Maintained with one or two waterings a month under heavy traffic and one every four months under light traffic.
DMS-DS 100®Soil stabilizer
A soil stabilizer that is also used on haul roads and ramps: it reduces dust by up to 85–95%, uses at least 80% less water and makes the effect last 4 to 5 times longer than water alone. Details in Soil stabilization.
InstrumentsRed-Box®, BlueBox®, V-Sense, Motion
Red-Box® and BlueBox® for PM10 and PM2.5; V-Sense and Motion for friction and braking distance; IRI for road roughness.
DMS-ONE®Platform
Heat maps by road condition, historical and real-time values, historical weather data and a 14-day forecast, and a record of water and fuel savings.

How a road section is measured

A pickup truck drives the section at constant speed with the monitor's probe behind the rear tire, where the dust is raised. The same pass is repeated on the untreated road, which is the baseline, and on the treated road.

Dust measurement on a road sectionEPA OTM 34 methodProbe behind the rear tireTSI DustTrak II 853040 km/hSection of ≈ 200 mEfficiency = (reference − measured dust) ÷ reference × 100
Diagram of the method, not to scale. Pickup truck at 40 km/h, TSI DustTrak II 8530 probe behind the rear tire, sections of ≈ 200 m, EPA OTM 34. Efficiency is computed against the baseline of the same section.

Our approach

Monitor → Treat → Optimize

A measured baseline, treatment at the source, and verification against that same baseline.

  1. 01

    Monitor

    Fixed and GPS-equipped mobile sensors, cameras with computer vision, weather stations and reference gravimetric sampling. The baseline for each section and each front is established first.

  2. 02

    Treat

    An hour-by-hour dust risk index built on the forecast, watering scheduled by road segment, an optimal route, execution through the operator app, and remote control of the equipment in the field.

  3. 03

    Optimize

    Suppression efficiency computed against the baseline, adherence to schedule, actual water and additive against plan, and road regularity. Exportable report.

What we are asked most

Do we have to change the water truck or stop traffic?

DMS-DS® is added to the water truck loaded with water, mixed and applied with that same truck. Traffic does not need to be interrupted.

Does the treated road become slippery?

On the contrary: braking distance is 35–82% shorter than on a road wetted with water, and the risk of skidding and hydroplaning is reduced. It was tested on ramps of up to 16% with 600 t trucks.

How much water is saved?

Up to 90% with DMS-DS®, because the road needs fewer water truck passes.

How is effectiveness demonstrated on the road?

With a pickup truck at 40 km/h carrying the probe of a TSI DustTrak II 8530 behind the rear tire and driving sections of ≈ 200 m, under EPA OTM 34. Efficiency is computed against the baseline of the same section and reported by ramp and by area.

Tell us the soil, the traffic, the grades and the current watering

With that we propose the additive for your roads and the method by which the result will be measured against your baseline.

Request a haul road assessment

Cases using this application