Published cases, with their figure and method
Each case brings together the site context, the solution applied and the result obtained.

Ray-Car quarry · Canada
From 18.1 to 0.063 mg/m³ on the access ramp
Traffic of up to three vehicles per minute on a graded ramp, and up to eight tanker passes a day that eroded the road instead of stabilizing it.
- documented average suppression
- 95.13%
- documented average suppression
- less water used
- 75%
- less water used
- less road grading and repair
- 50%
- less road grading and repair
- water truck passes, down from 8
- 2 passes/day
- water truck passes, down from 8
TSI DustTrak 8530 — EPA-referenced sensorEPA OTM 34 · 12 capture sessions
Read the full case
Vale · Brazil
91 to 98% less PM10 at the Mariana complex
Roads heavily exposed to dust, with low-efficiency daily watering (40 to 60% suppression) and excess water use equivalent to the monthly consumption of 36,000 people.
- reduction in PM10 emissions
- 91–98%
- reduction in PM10 emissions
- maximum water savings
- 90%
- maximum water savings
- avoided per year
- 12,500 t CO₂/yr
- avoided per year
EPA OTM 32
Read the full case
Minera Antucoya · Chile
Baseline first, then a 50 to 60% reduction
Secondary and tertiary crushing was the plant's main emission source. The R&D team deployed continuous monitoring and gravimetric sampling to establish a reliable baseline before intervening.
- short-term reduction in emissions
- 50–60%
- short-term reduction in emissions
- reduction target
- 90%
- reduction target
Red-Box® + BlueBox® — continuous monitoring validated against reference gravimetric sampling
Read the full case
Codelco División Ministro Hales · Chile
91 to 98% suppression, after testing more than ten solutions from suppliers worldwide
Between 2016 and 2018 Codelco tested more than ten solutions from suppliers worldwide on ramps with 10 to 15% grades, measuring braking distance and suppression efficiency over one to two months per supplier.
- dust suppression
- 91–98%
- dust suppression
- water savings
- 80–90%
- water savings
- improvement in braking distance
- 32–80%
- improvement in braking distance
- more effective and economical than chloride salts
- 40–60%
- more effective and economical than chloride salts

Codelco División Ministro Hales · Chile
85% less respirable dust at the loading front
A different case from the haul roads, at the same division: long-range fog cannons with DMS-DS® additive over the loading point, where emission concentrates and visibility governs safety.
- reduction in respirable dust
- 85%
- reduction in respirable dust
- water savings, at least
- 40%
- water savings, at least

Codelco División Radomiro Tomic · Chile
The validation holds on 15% ramps
In 2018 Radomiro Tomic evaluated advanced dust control solutions on ramps with 15% grades. DMS-DS® arrived already validated at Ministro Hales and exceeded expectations, this time with the platform integrated.
- suppression of PM10 and PM2.5
- 91–98%
- suppression of PM10 and PM2.5
- maximum water savings
- 90%
- maximum water savings
- maximum improvement in braking distance
- 80%
- maximum improvement in braking distance

Hudbay Minerals · Canada
Up to 98% less visible dust in Manitoba
Dust control on the site roads with DMS-DS 100®. The site ended up cleaner, safer and needing less maintenance.
- maximum reduction in visible dust
- 98%
- maximum reduction in visible dust
- water savings
- 90%
- water savings

Forestal Arauco · Chile
40% less aggregate on forest roads
Stabilization of haul roads in southern Chile. Less construction material per kilometer, shorter build time and lower dust emissions.
- savings on aggregates
- 40%
- savings on aggregates

Big Stone Road · Canada
It paid for itself in 9 days, and held 48 without a water truck
A municipal road carrying 1,200 to 1,500 vehicles a day that required two water trucks and a grader day and night. DMS-90® was chosen because its cost is comparable to that of calcium chloride.
- for the application to pay for itself
- 9 days
- for the application to pay for itself
- without a single water truck or grader
- 48 days
- without a single water truck or grader
- vehicles before the first snowfall
- 50,000
- vehicles before the first snowfall

Southern Peru Copper Corporation · Peru
Awarded through an international tender
SPCC evaluated dust control solutions through an international tender. ABCDust was selected and the goals were met and exceeded: effective suppression, optimized water use, and better friction and traction for the haul trucks.
Read the full case
Zijin Continental Gold · Colombia
5 km of access road with 1,000 liters
Dust control on the 5 km access road of a gold mine during the high season, improving operating conditions and reducing environmental impact.
- of access road treated
- 5 km
- of access road treated
- of DMS-DS 90 used
- 1,000 L
- of DMS-DS 90 used